THE WORKSHOPS IN LONG THANH, DONG NAI

 

  • Established date: 10/2019
  • Infrastructure: ready and synchronous
  • The total area: 98.800 m2
  • The total factory space to: 56.500 m2
  • The number of factories:
  • Electricity supply system: 220/110KV, belonging to the national grid
  • Long Thanh belongs to the national grid and guaranteed to supply power (22KV) constantly (24/24 hours)
  • The minimal area 2.000m2
  • Water supply system: 100,000 m3/ day
  • The load capacity of the floor: 2 tons/ m2

Ready-built factories bring advantages to help businesses to solve difficulties in factory construction, save time and budget.

To help manufacturers shorten construction time and put production lines into operation quickly. The New Generation Corporation launched a chain of ready-built factories with diverse areas and reasonable prices.

Ready-built factories are an optimal choice for businesses that want to go into production immediately and save on initial investment costs. Many foreign enterprises, especially small and medium ones tend to find ready-built factories to reduce initial investment costs and limit risks.

The New Generation Corporation’s ready-built workshops were born to meet the diverse needs of all businesses (from ​​2,000m2 to 8,000m2 or more on a total area of ​​56,500 m2) in order to soon put into operation. It would also create favorable conditions for some investors wishing to open small factories to explore the market before investing in long-term.

In addition, the New Generation Corporation also builds customized factories that are suitable to each product category with a lot of supportive services such as hiring workers, management consulting and supporting some licensing procedures.

Utilities, professional services and complete infrastructure of the ready-built factory complex in Loc An Industrial Park - Binh Son

  • Road system: The factory complex has main gate adjacent to the internal road of the industrial park
  • Electricity supply system: Use the regional power grid system including a 03-phase power meter 200V, 30A, 50Hz, serving for 24-hour production businesses.
  • Water supply system: Use water supplied from the local water supply system of the industrial park.
  • Drainage system: Sewage will be drained out of the common sewer along the main road
  • The communication system includes VNPT, Viettel, and FPT to give good service to investors.
  • Green trees are arranged in harmony to create scenery and clean environment.

Please contact us now to get more information.

Other Posts

prev_doitac next_doitac