Dong Nam Industrial Zone

Established date:

2008

Infrastructure:

READY

Total area:

342 ha

Total factory area:

338,38 ha

Number of workshops:

1

Power Source:

Capacity 3 x 63 MVA

Minimum area:

1000 m2

Water supply:

200.000 m3/day-night

Floor payload:

3 Ton/m2

Cu Chi District, Ho Chi Minh City.

T: 0839696979

Map
  • Overview
  • Location
  • Utilities
  • Plan
  • Description
  • Water test result

Dong Nam Industrial Park prioritizes the development of efficient high-tech and clean technology activities in fields such as mechanical engineering, information technology, and chemical processing (pharmaceutical products, herbal products, high-quality plastics), construction materials, furniture manufacturing and sports equipment manufacturing. Sai Gon VRG aims to develop the industrial park into a high-tech manufacturing hub with the lowest impact on the environment.

With an area of ​​342 hectares, Dong Nam Industrial Park is strategically located in an ideal investment location for businesses.  Dong Nam IP provides complete infrastructure packages that are safe, efficient and environmentally friendly along with the best support services for the client.

Dong Nam Industrial Park is located in a strategic location between two key areas: TP. Ho Chi Minh City, with a full range of financial, scientific and human resources, and Binh Duong province, the nation's leading region in terms of foreign direct investment. Dong Nam Industrial Park has advantages from supporting industries of the southern key economic region and is easily connected to road and inland waterway transportation.

For specialists and managers living in Ho Chi Minh city, the distance to Dong Nam Industrial Park is relatively short; In addition, the abundant labor force in the area provides stable manpower for factories in the IP.

Dong Nam industrial park

Geographical location:
- Located in Ho Chi Minh City (Cu Chi district), the leading economic center of Vietnam. Located in the gateway of international trade, on the highway linking the center of Ho Chi Minh City to Moc Bai international economic border gate, convenient for transportation, both road and waterway.
- Close to abundant labor resources, including local workers, from provinces and high-level human resources from Ho Chi Minh City.
- Distance from Southeast Industrial Zone To important locations:
* 26 km Center of Ho Chi Minh City
* 01 km Binh Duong Province
* 21 km from Tan Son Nhat Airport
* 10 km Trans-Asia Road (HCMC - Cambodia)
* 18 km Northwestern Urban Area, HCMC
* 42 km of Hiep Phuoc Container Port
* 25 km ICD Phuoc Long
* 56 km Moc Bai Border Gate
* 24 km from Saigon Railway Station
* 29 km from Bien Hoa City, Dong Nai
Area of about 338.38 ha. Minimum subdivision 5000m

Dong Nam industrial park - Map

 

Dong Nam Industrial Park is located in a strategic location between two key areas: Ho Chi Minh City, with a full range of financial, scientific and human resources, and Binh Duong province, the nation's leading region in terms of foreign direct investment.

POWER SUPPLY

Electricity is provided from the on-site power station with capacity of 3 x 63 MVA operated by Sai Gon VRG - ensuring stable quality power to the factory of investors

WATER SUPPLY

Clean water is supplied from on-site water plant, capacity 15,000 m3/day-night and from Thu Dau Mot station with capacity of 200,000 m3/day-night. Supplied water quality meets QCVN 01:2009/BYT standards

WASTEWATER TREATMENT

Wastewater is collected and treated centrally at the on-site wastewater treatment plant with capacity of 8,500 m3/day-night. Treated water meet Grade A standards as prescribed in QCVN 40:2011/BTNMT before discharging

RENTAL FACTORY/WAREHOUSE

Rental Factory/Warehouse in the industrial park, for small and medium businesses, companies in the supporting manufacturing industries, companies needing warehouse space, etc.

TRAFFIC SYSTEM

Wide roads, meeting the needs of clients: Main road: 6 lanes with width of 40m; Internal road: 1-4 lanes with width of 18-29m

SUPPORTING AMENITIES

Utilities and services to support the IZ include: On-site customs office, On-site Inland clearance port, Logistics Center, Bank, Supermarket, Gas Station, Shophouse for Lease, Factory/Warehouse for Lease, Dormitory, Residential, Market area, etc.

prev_doitac next_doitac